John likes Word. He uses it everyday, and is good with it and HTML, and tags and such.
I like Excel. And tomorrow I get to play with it.
Wednesday for work, I went to Stockton and performed a slug test on two extraction wells. We dropped a five foot long plug into each well, and measured the drop in the water level as it returned to normal. then we pulled it out, and watched as the water level rose to return to normal.
We gathered data for 45 minutes for each test using a dedicated transducer to take a reading every second. As you can imagine that ends up being a lot of data points. So tomorrow I get to graph those pints, and then run some calculations on them to determine the hydraulic conductivity of the aquifer. Plus I have to make the tables pretty for the upcoming report.
See? Fun.
Showing posts with label Stockton. Show all posts
Showing posts with label Stockton. Show all posts
Thursday, November 05, 2009
Tuesday, May 12, 2009
Done
And we're all done.
Got home, and Jennifer and I went out for some food.
Now, I'm just reading.
And looking forward to an extra two hours of sleep tonight.
Got home, and Jennifer and I went out for some food.
Now, I'm just reading.
And looking forward to an extra two hours of sleep tonight.
Monday, May 11, 2009
Stockton - One More Day
It's the little things that make a job difficult. Especially when it's a well full of silt and clay in suspension in the water that makes the well too buoyant to stay in place or the sand pack to fall into place making it impossible to set the well.
We're letting the casing sit overnight, and we're going to hope all the sediment settles out and then we'll set the well in the morning.
Then we just have one more well to go.
We're letting the casing sit overnight, and we're going to hope all the sediment settles out and then we'll set the well in the morning.
Then we just have one more well to go.
Friday, May 08, 2009
Done with the Week
... and almost done in Stockton.
Very tired after a logn day, after a short night.
Very tired after a logn day, after a short night.
Boldly Going Late into the Night
Today was a wonderful day in the field. Nice and sunny, and a strong wind most of the day. It kept the vapors under control, and most of the heat off of us.
We managed to get the rest of the extraction wells (2 vapor and one groundwater) completed today. All that is left is to set the well boxes.
Tomorrow we'll be drilling in someone's backyard.
***
And even with the great field accomplishments, I managed to go see Star Trek tonight. My coworker was incredulous that I would go see a movie at 10:00 PM, and then plan to get up in time to be on site in Stockton at 7:00 AM.
Perhaps.
But the film was amazing. Everyone gets there one line. The new crew is great, and the story is pretty tight (for Star Trek).
The sign to watch for in engineering is the gratuitous oxymoron: INERT REACTANT.
We managed to get the rest of the extraction wells (2 vapor and one groundwater) completed today. All that is left is to set the well boxes.
Tomorrow we'll be drilling in someone's backyard.
***
And even with the great field accomplishments, I managed to go see Star Trek tonight. My coworker was incredulous that I would go see a movie at 10:00 PM, and then plan to get up in time to be on site in Stockton at 7:00 AM.
Perhaps.
But the film was amazing. Everyone gets there one line. The new crew is great, and the story is pretty tight (for Star Trek).
The sign to watch for in engineering is the gratuitous oxymoron: INERT REACTANT.
Wednesday, May 06, 2009
The Field... The Field...
And so with today's two vapor extraction wells installed, we are right on schedule to complete our latest job by next Thursday.
Should things go well, we'll be ahead of the game by at least one day possibly two tomorrow.
***
Last night I read a Jim Butcher short story, and this evening I've finished another one. they really are amazing, and they give a good momentum for what's going on between the full length novels.
I think I'll just set Donnerjack aside for a while.
***
And tomorrow night, Jennifer, Holly, and I are going to see the new Star Trek. I'm, excited, Holly is excited, and Jennifer is beside herself.
Should things go well, we'll be ahead of the game by at least one day possibly two tomorrow.
***
Last night I read a Jim Butcher short story, and this evening I've finished another one. they really are amazing, and they give a good momentum for what's going on between the full length novels.
I think I'll just set Donnerjack aside for a while.
***
And tomorrow night, Jennifer, Holly, and I are going to see the new Star Trek. I'm, excited, Holly is excited, and Jennifer is beside herself.
Tuesday, May 05, 2009
The Stockton Countdown
So here's how it is:
We're back at my site in Stockton, and we're getting some backlog finished as well as preparing for our pilot test before our system install. We have to install:
1 deep offsite groundwater monitoring well
1 shallow offsite groundwater monitoring well
2 groundwater extraction wells
4 soil vapor extraction wells
We got the first groundwater extraction well installed today. I'll be out there through next Thursday.
Please remember to tip your waitresses.
We're back at my site in Stockton, and we're getting some backlog finished as well as preparing for our pilot test before our system install. We have to install:
1 deep offsite groundwater monitoring well
1 shallow offsite groundwater monitoring well
2 groundwater extraction wells
4 soil vapor extraction wells
We got the first groundwater extraction well installed today. I'll be out there through next Thursday.
Please remember to tip your waitresses.
Subscribe to:
Posts (Atom)