Monday, February 09, 2009

Drilling Deep - Day 4

Today we set the first well after drilling to 85 feet.

Things were going well (I swear, no pun intended) at first, but the water was so silty that the well casing kept floating up and out of the sand pack. It slowed the drillers down, but we did manage to get off site at 5:00.

Sunday afternoon, after my time with Dian, I watched the animated collection Batman: Gotham Knight. Aside from the extreme anime influences, I really enjoyed it. The combination of influences from the new movies added to the basic Batman mythos went together very well.

No comments: